How deep is the service duct bank measured from finish grade to the top of the concrete encasement that runs between the D.L. pad mount transformer and the main electrical switchboard

Respuesta :

RayCrochet RayCrochet
  • 03-10-2019

Answer:2' 6

Explanation:

E1.1

2 feer deep 6 inch divider

Answer Link

Otras preguntas

ConConsider the following system of equations:2x + 3y = 45x+y = 10What is the x-value of the solution for this system?​
Write and solve an equation to answer the question, "5 is 5% of what number w?" An equation is blank =0.05 blank . The solution is w= blank.
Which of the following functions is graphed below?
If an author's purpose is to convince readers of something, which form is he or she likely to choose?
494.4 80% of what amount​
A stone is dropped down a well and hits the water 2.50 s later. What is the depth from the edge of the well to the water? 61.3, 12.3, 30.6
which of The following situations show evidence of scapegoating
41/8 - 1/3 = what????​
Jasmine. made a pitcher of lemonade. One pitcher contains 12 glasses of lemonade. After Jasmine serves 4 glasses of lemonade, how many more glasses, g, can she
Please help!!! Will mark brainliest!!!