raineirybelle
raineirybelle raineirybelle
  • 04-05-2020
  • Mathematics
contestada

The time (t) it takes for a group of volunteers to construct a house varies inversely as the number of hours (h). If 20 volunteers can build a house in 62.5 working hours, how many volunteers are needed to build a house in 50 working hours?
Select one:
A. 1250
B. 50
C. 125
D. 25

Respuesta :

arlen54
arlen54 arlen54
  • 04-05-2020
The answer to this question is D. 25
Answer Link

Otras preguntas

Which points are located on the y-axis? Check all that apply. (0, 3) (4, 0) (9, 0) (0, 11) (14, 0)
We do NOT value art for its_____________value.
the value of x in the solution to the system x+y=10 and x-y=4
PLZ HELP 100 POINTS AND DUE TODAY I WILL BE SO GRATEFUL!!
Chlorophyll a a. absorbs mostly orange-red and blue-violet light. b. absorbs mostly green light. c. is an accessory pigment. d. is responsible for the red color
the treaty of versailles was also known as
what was one reason the mauryan empire was able to control almost all the indian subcontinent?
5. Use the quadratic model y = -4x^2 - 3x + 4 to predict y if x equals 5. A. -89 B. -111 C. -411 D. -51
estimate the solution of the equation to the nearest while number 7.8 ÷ n = 38.2 n≈35 n≈30 n≈30 n≈20 n≈25
Boring sentence: General Zaroff lived in a big house