15 workers working 8hrs a day can complete a piece of work in 20 days. In how many days will 10 workers do it,working 6 hrs a day? please help!!

Respuesta :

ridmitharuka
ridmitharuka ridmitharuka
  • 02-08-2021

Answer:

40 days

Step-by-step explanation:

w1*h1*d1=w2*h2*d

15*8*20=10*6*d

2400=60d

d=2400/60

d=40

Answer Link

Otras preguntas

Order of operations (-9)\3(-11)(4)
What does composition mean in science
In the diagram below, what is the approximate length of the minor arc ?
If air resistance can be neglected, how does the acceleration of a ball that has been tossed straight upward compare with its acceleration if simply dropped?
Consider the incomplete reaction below. NaOH + X mc005-1.jpg NaCH3COO + H2O What is X in this reaction? NH4OH H3PO4 H2CO3 CH3COOH
what is chromatogram and chromatography
New major food crops developed in recent times are: few many some none
Unexpected violations of spatial logic and universal order characterize the work of japanese designer _____________. playfulness, humor, and intentional ambigui
There was 2/3 of a pan of a lasagna in the refrigerator. Bill and his friends ate half of what was left. Write a number sentence and draw a model to represent t
A plane can fly 7 miles per minute. The plane will fly 8 trips, and each trip is 810 miles. How many hours will the plane fly? Show your work to receive full cr