hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

In an aqueous solution, the solute is the part of the solution that is being dissolved in water. True or False?
Which of these entries... 15 points​
How is energy utilized in photosynthesis?​
A(n) _______ is turned by the crankshaft, compresses the air, and forces it into the engine.
Use the Rydberg equation to calculate the wavelength (in nm) of the photon emitted when a hydrogen atom undergoes a transition from n = 5 to n = 2.
cuales son los paises sudamericanos que han aprobado leyes de comunicacion en la ultima decada
Each person should list one cognitive bias (anchoring, for example) that is mentioned or referred to in the readings for this week. Define it (you can Google fo
In which state 94% of all fair price shops are run by cooperatives???? (a) Maharashtra (b) Punjab (c) Tamil Nadu (d) Gujarat
Humans have existed for about 106 years, whereas the universe is about 1010 years old. If the age of the universe is defined as 1 "universe day," where a unive
If a reaction of 5.0 g of hydrogen with 5.0 g of carbon monoxide produced 4.5 g of methanol, what was the percent yield?