a contactor hired 150 men to pave a road in 30 days.how many mem will be hire to do the same work in 20 days​

Respuesta :

kevinmario2008 kevinmario2008
  • 05-12-2021

Answer:375

Step-by-step explanation:W = RTN

1 = 1/7500(20)N

1 = 20/7500N

1 = 2/750N

750(1 = 2/750N)

750 = 2N

750/2 = N

375 = N

There are 375 men to do the job in 20 days

Answer Link

Otras preguntas

What is determined by motion and the spacing of particles?
g5-h3 if g=2 and h=7 solve expression
A procedure designed to test a hypothesis
Describe how the coming of World War II ended the Great Depression. What region of the nation benefited most spectacularly?
What is 1/3 of 9 if u know please tell me thanks
Write an equation yo model each situation then solve ! A stack of 12 bricks is 27 in. High. What is the height of each brick
The first light bulb had a filament made of _____.
how to find all real and imaginary zeros of f(x)=x^4+5x^2-5x^3-6+5x
pluralize "le frère de marie est sympathique".
How do I convert negative 3 over 5 to a decimal