if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

Una rueda gira con una frecuencia de 530 rpm. Determina la velocidad angular, el periodo y la frecuencia.
Read this excerpt from a story. Antwon and his sister stepped gingerly down their porch stairs, reaching the driveway with some difficulty. "I can’t believe the
Need help answering pls
Alice and Bob play a game by taking turns removing 1 or 2 stones from a pile that initially has n stones. The person that removes the last stone wins the game.
BESTIES PLEASE HELP ME
Simplify the expression. 16m - 3/5 + 4m - 2 2/5 + 4A 20m-3B 20m+1C 12m+1D 12m-3​
which best describes climate change​
What is the surface area? 17 ft 16 ft 17 ft 19 ft 15 ft
Earth is called as 'sweet flowing breast' because​
what dose 2 + 2 = ?????????