liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

The mont blanc region is known for an abundance of what?.
Solve for X. Leave your answer in the simplest radical form. Image down below! Someone please help me with this, I’ll give you brainlist and points!
Calculate the mass (in g) of 346 cm³ of polythene. The density of polythene is 0.95 g/cm³. Give your answer to 2 decimal places.
Kumar hit the tree with his stick .passive​
The sale price of an item is $105 after a 30% discount is applied. What is the original price of the item? SHOW WORK PLEASE AND THANKYOU and be quick please
Simplify 1/3 + 4/x-2 = 6
The solution to an inequality is graphed on the number line. What is another way to represent this solution set? -5 -4 -3 O {x | x <4.5) O {x x 34.5} O {x |
the volume of this is cone 923.16 cm what is the radius of this cone
An object of mass m is oscillating with a period T. The position x of the object as a function of time is given by the equation x(t)=Acosωt . The maximum net fo
Why would the force of gravity change between the earth and sun when the mass of the earth increased