BRAINLIEST ANSWER: Two workers finished a job in 7.5 days. How long would it take each worker to do the job by himself if one of the workers needs 8 more days to finish the job than the other worker?

Respuesta :

akeel5
akeel5 akeel5
  • 04-04-2019

Answer:

first we must times 7.5 into 8 to find out what the answer is,

the answer is 60

Answer Link

Otras preguntas

Which words in the sentence make up the appositive? Which word does the appositive rename? Many letters of support were sent to the candidate Jack Candless. A.
Compared with the rest of Europe, northern Italy had many what ?
In England people associate the acceptance of their bill of rights with the reign of
what is a fraction of 42 is 7
what part of colonial culture does the Gullah dialect reflect
When an object is seen moving in relation to a stationary object, the stationary object is called the frame of reference or reference point.
4(x-2)-3=9 I have to solve for X but I'm confused
What was the cause of the conflict between Cuba and Spain?
why was northern Italy a natural birthplace for the renaissance?
Early in mitosis, the nucleus, nucleolus, and nuclear envelope begin to dissolve in preparation for cell division. In which stage of the cell cycle is this proc