​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

what is the true meaning of high school sports
Which of the following statements does NOT correctly describe the results from cloning dairy cows? Cloning of dairy cows increases the production of dairy milk.
Which of the following acts changed the culture of education in the U.S.? a. Dodd-Frank Act b. Civil Rights Act c. Serviceman’s Readjustment Act d. Immigration
0.3=0.5f-0.7 solve for f
Explain why we have tides on Earth?
What is the area to a 2 3/4 inch square?
Identify items in your life that are made of each type of element: metal, nonmetal, and metalloid. For each item, explain why the properties of that type of ele
Use algebra to evaluate the following limit ((3+h)^2-9)/h
Why is most of japan's population homogeneous?
A share of ownership in a company is known as which of the following? A. Stock B. Investment C. Rebate D. Bond