aroa2020 aroa2020
  • 02-05-2021
  • Biology
contestada

la evaluacion de impacto ambiental se puede realizar antes durante y despues de implementar un proyecto​

Respuesta :

harrylong1406 harrylong1406
  • 02-05-2021

Answer: do u speak English

Explanation:

Answer Link

Otras preguntas

Two marathon runners leave the starting gate, one at 16 mph and the other at 12 mph. If they maintain the pace, how long will it take for them to be 1/3 of a mi
What was the importance of George Washington's retiring from the U.S. Presidency?
correct the capitalization. Some goals the Lewis and Clark expedition were exploration and Scientific Research.
Simplify the expression 5(2a + 3b) - 4(3a - 5b).
0.0058=5.8x10r what is the value of r in the equality belone
What is the monomer called if it is lacking a phosphate group?
If there were to be 8 boys and 13 girls at a party and the host wanted each to be given exactly the same number of candies that could be bought in packages cont
1 Without smell and taste many of our everyday experiences would be bland. Cuisines of the world feature characteristic spices that enliven their dishes. Simila
Qué declaracion mejor describe un historiador?
2 Match the equivalent expressions. y²² 0 This shaded model represents 100%​