ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

Why did the Republican Isolationists refuse to ratify President Wilson’s League of Nations? A:They were angry about the president’s decision to take only one Re
describe the 3 types of ecological pyramids
Why is mechanics in writing important
what type of verb is the underlined word in the sentence? lindsey and her family visited the museum. a. intransitive b. transitive
x squared minus x minus 6 =0
Which source would best help a historian understand how the Great Chicago Fire affected families? 1. a biography of a Chicago family displaced by the fire 2. a
What would you do if you became a president of the United States? Write down.
10. what is at the base of all ecological pyramids?
What was the basic political of Sumer
what is the radius of a circle with a circumference measuring 24π cm